{"id":26740,"date":"2026-11-27T15:02:45","date_gmt":"2026-11-27T09:32:45","guid":{"rendered":"https:\/\/recruiterflow.com\/blog\/?p=26740"},"modified":"2026-11-27T15:07:06","modified_gmt":"2026-11-27T09:37:06","slug":"ats-migration-timeline","status":"publish","type":"post","link":"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/","title":{"rendered":"How Long Does an ATS Migration Take? A Week-by-Week Timeline"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Every ATS migration quote comes with a number. Very few come with a definition of what that number covers.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A full ATS migration for a recruiting or search firm typically takes 6 to 8 weeks, including notes, call logs and communication history. A simpler move, mostly structured records from a spreadsheet or basic system, can be done in about 2 weeks. The gap between those two numbers is where most firms get surprised.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This post covers the full ATS migration timeline week by week: what happens in each week, who owns each step, what speeds a migration up, and what quietly adds weeks to it.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"The_short_answer_and_why_vendor_quotes_differ\"><\/span><b>The short answer, and why vendor quotes differ<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Two vendors can quote &#8220;two weeks&#8221; and &#8220;eight weeks&#8221; for the same database and both be honest. They are usually measuring different things.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">&#8220;Live&#8221; can mean your team can log in, add candidates and run pipelines. &#8220;Migrated&#8221; means your full history, including every note, call log, email thread and attachment, is in the new system, mapped correctly and searchable. Structured fields move quickly. Unstructured history takes longer, and it is sometimes scoped separately.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">That history matters more than most firms realise. Around 71% of placements come from candidates already in the database before the job opened <\/span><i><span style=\"font-weight: 400;\">(Source:<\/span><\/i><a href=\"https:\/\/recruiterflow.com\/ebooks\/recruiting-benchmark-report\" target=\"_blank\" rel=\"noopener\"> <i><span style=\"font-weight: 400;\">The Economics of Recruiting<\/span><\/i><\/a><i><span style=\"font-weight: 400;\">)<\/span><\/i><span style=\"font-weight: 400;\">. The notes explaining why a candidate turned down an offer, or which hiring manager actually signs off, are where that value lives. Before comparing timelines, it is worth knowing<\/span><a href=\"https:\/\/recruiterflow.com\/blog\/ats-migration-for-recruitment-firm\/\" target=\"_blank\" rel=\"noopener\"> <span style=\"font-weight: 400;\">what actually moves over<\/span><\/a><span style=\"font-weight: 400;\"> in each vendor&#8217;s quote.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">At <a href=\"https:\/\/recruiterflow.com\/\" target=\"_blank\" rel=\"noopener\">Recruiterflow<\/a>, a complete migration usually takes 6 to 8 weeks, and in some cases as little as 2 <\/span><i><span style=\"font-weight: 400;\">(Source:<\/span><\/i><a href=\"https:\/\/recruiterflow.com\/blog\/recruiterflow-migration\/\" target=\"_blank\" rel=\"noopener\"> <i><span style=\"font-weight: 400;\">How to Migrate to Recruiterflow<\/span><\/i><\/a><i><span style=\"font-weight: 400;\">)<\/span><\/i><span style=\"font-weight: 400;\">. That window covers the full history, not just a login, and the team can work in the platform from day one while the migration runs.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Before_week_one_the_prep_that_saves_two_weeks\"><\/span><b>Before week one: the prep that saves two weeks<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The fastest migrations are decided before the contract is signed. Three pieces of prep make the biggest difference.<\/span><\/p>\n<p><b>Audit before you export.<\/b><span style=\"font-weight: 400;\"> Merge obvious duplicates, archive records nobody will ever search, and standardise free-text pipeline stages. Every messy record you clean now is one less correction cycle in week five.<\/span><\/p>\n<p><b>Name one owner.<\/b><span style=\"font-weight: 400;\"> Not a department, a person. They answer mapping questions, chase sign-offs and make the call when two partners disagree on how stages should work.<\/span><\/p>\n<p><b>List your go-live integrations.<\/b><span style=\"font-weight: 400;\"> Separate the tools your team needs on day one, such as email, calendar and job boards, from the ones that can follow. Every integration added to the go-live list adds time to the plan.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"The_week-by-week_ATS_migration_timeline\"><\/span><b>The week-by-week ATS migration timeline<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Here is how a full 8-week migration typically runs, based on the six-phase process Recruiterflow uses. Smaller or cleaner databases compress several of these weeks.<\/span><\/p>\n<h3><b>Week 1: Discovery and data hand-off<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Both teams agree on scope: which objects move, which custom fields matter, and how your firm actually works. Your side requests a full backup from the current system, and the export is downloaded.<\/span><\/p>\n<p><b>Who owns it:<\/b><span style=\"font-weight: 400;\"> shared. Your old vendor&#8217;s export speed is the most common week-one delay.<\/span><\/p>\n<h3><b>Week 2: Data validation and field mapping<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The export is checked for completeness and structural integrity before anything is transformed. Then field mapping starts: custom fields, pipeline stages, record owners and tags are matched to the new system.<\/span><\/p>\n<p><b>Who owns it:<\/b><span style=\"font-weight: 400;\"> the vendor validates; your team confirms the mapping.<\/span><\/p>\n<h3><b>Week 3: Extraction and transformation<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">This is the heavy lifting, and it happens on the vendor&#8217;s side. Records are reshaped to fit the new structure, with notes and activity history attached to the right candidates, contacts and jobs.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In parallel, your team can start working. Core features are usable from day one, and workflow configuration, email templates and<\/span><a href=\"https:\/\/recruiterflow.com\/sequences\" target=\"_blank\" rel=\"noopener\"> <span style=\"font-weight: 400;\">multichannel sequences<\/span><\/a><span style=\"font-weight: 400;\"> can be set up now.<\/span><\/p>\n<p><b>Who owns it:<\/b><span style=\"font-weight: 400;\"> the vendor.<\/span><\/p>\n<h3><b>Week 4: First run into a sandbox<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The migrated data is loaded into a test account, followed by a first internal validation round. Nothing touches your live environment yet.<\/span><\/p>\n<p><b>Who owns it:<\/b><span style=\"font-weight: 400;\"> the vendor.<\/span><\/p>\n<h3><b>Week 5: Refinement<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">This is the week your team matters most. Open records you know well, such as a recent placement, a long-running client or a candidate with years of notes, and check that everything is there and in the right place. Fixes are made and a second validation round follows.<\/span><\/p>\n<p><b>Who owns it:<\/b><span style=\"font-weight: 400;\"> your team reviews; the vendor fixes.<\/span><\/p>\n<h3><b>Week 6: Sign-off, training and integrations<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Your owner signs off on the final review. Training runs by role, so consultants, researchers and admins each learn what they use. Go-live<\/span><a href=\"https:\/\/recruiterflow.com\/integrations\" target=\"_blank\" rel=\"noopener\"> <span style=\"font-weight: 400;\">integrations<\/span><\/a><span style=\"font-weight: 400;\"> for email, calendar, phone and job boards are connected and tested.<\/span><\/p>\n<p><b>Who owns it:<\/b><span style=\"font-weight: 400;\"> shared.<\/span><\/p>\n<h3><b>Week 7: Final run and go-live<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">The migrated data, plus every record created in the old system since the export, is loaded into the production account. The team goes live.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Keep a short parallel period, around two weeks, with all new activity entered only in the new system. Long parallel runs feel safer but are not, because data starts piling up in two places.<\/span><\/p>\n<p><b>Who owns it:<\/b><span style=\"font-weight: 400;\"> the vendor runs the load; your owner sets the cut-over rule.<\/span><\/p>\n<h3><b>Week 8: Stabilise and retire the old system<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Check adoption user by user, not as a team average, and follow up with anyone who has not logged in. Once the parallel period ends, set a date to retire the old system and agree how long you keep read-only access to it.<\/span><\/p>\n<p><b>Who owns it:<\/b><span style=\"font-weight: 400;\"> your team.<\/span><\/p>\n<h3><b>The timeline at a glance<\/b><\/h3>\n<table>\n<tbody>\n<tr>\n<td><b>Week<\/b><\/td>\n<td><b>What happens<\/b><\/td>\n<td><b>Who owns it<\/b><\/td>\n<td><b>Done when<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">1<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Discovery and data export<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Shared<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Full export received<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">2<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Validation and field mapping<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Vendor, then your team<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Mapping confirmed<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">3<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Extraction and transformation<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Vendor<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Data ready to load<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">4<\/span><\/td>\n<td><span style=\"font-weight: 400;\">First run into sandbox<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Vendor<\/span><\/td>\n<td><span style=\"font-weight: 400;\">First validation complete<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">5<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Refinement and second validation<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Your team reviews, vendor fixes<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Feedback resolved<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">6<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Sign-off, training, integrations<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Shared<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Final sign-off given<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">7<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Final run and go-live<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Vendor, then your team<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Team working live<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">8<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Stabilise and retire old system<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Your team<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Old system retired<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"The_2-week_track_when_a_faster_migration_is_realistic\"><\/span><b>The 2-week track: when a faster migration is realistic<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Some firms can compress the whole plan into about two weeks. That is realistic when most of these are true:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">You are moving from spreadsheets or a basic system with simple, consistent fields.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Your history is light, with few notes, attachments or email threads to carry across.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">You need only a handful of integrations on go-live day.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">One person can review and sign off within a day or two.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">The honest trade-off: a faster migration usually means less history is moving, not that the same work happened more quickly. If years of consultant notes are part of your database, plan for the full window.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"What_adds_weeks_and_how_to_avoid_each\"><\/span><b>What adds weeks (and how to avoid each)<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Most delays come from the firm&#8217;s side, not the vendor&#8217;s. That is good news, because it means they can be controlled.<\/span><\/p>\n<p><b>Is there a named owner on your side?<\/b><span style=\"font-weight: 400;\"> Without one, mapping questions bounce between partners for days. One decision-maker can keep the plan moving week by week.<\/span><\/p>\n<p><b>How long do sign-offs sit in an inbox?<\/b><span style=\"font-weight: 400;\"> Vendor timelines assume reviews come back promptly. A sandbox review that waits ten days adds ten days to go-live.<\/span><\/p>\n<p><b>How messy is the data?<\/b><span style=\"font-weight: 400;\"> Duplicates, free-text stages and inconsistent owner names each add correction cycles. Cleaning before export is far faster than fixing after.<\/span><\/p>\n<p><b>How many integrations are on the go-live list?<\/b><span style=\"font-weight: 400;\"> Each one needs connecting and testing. Move the nice-to-haves to the weeks after launch.<\/span><\/p>\n<p><b>Are notes, attachments and email history in the quote?<\/b><span style=\"font-weight: 400;\"> If they are scoped separately, the timeline you were given is not the full one. Ask before you sign.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For the full picture of what happens around the data move, including training and ownership, see our guide to the<\/span><a href=\"https:\/\/recruiterflow.com\/blog\/ats-implementation\/\" target=\"_blank\" rel=\"noopener\"> <span style=\"font-weight: 400;\">ATS implementation timeline<\/span><\/a><span style=\"font-weight: 400;\">.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Questions_to_ask_a_vendor_about_their_timeline\"><\/span><b>Questions to ask a vendor about their timeline<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">A timeline is only as useful as the assumptions behind it. These questions surface them quickly:<\/span><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Does your quoted timeline include notes, call logs, attachments and email history?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Can you show me a sample migration that included unstructured history, not just a reference call?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">What does the timeline assume about how fast my team returns reviews and sign-offs?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">How many validation rounds happen before go-live, and who checks the data?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Can my team work in the platform while the migration runs?<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">How long will we keep read-only access to the old system, and who pays for it?<\/span><\/li>\n<\/ol>\n<p><span style=\"font-weight: 400;\">A vendor that answers these in specifics is giving you a timeline you can plan around. If you are moving off Bullhorn specifically, this<\/span><a href=\"https:\/\/recruiterflow.com\/blog\/migrating-from-bullhorn-to-recruiterflow\/\" target=\"_blank\" rel=\"noopener\"> <span style=\"font-weight: 400;\">field-by-field migration guide<\/span><\/a><span style=\"font-weight: 400;\"> shows what that looks like in practice.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"What_firms_see_after_the_switch\"><\/span><b>What firms see after the switch<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Go-live is not the finish line. Weeks 9 to 12 are when a migration starts paying for itself, because the history you moved becomes something your team can actually use.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In Recruiterflow, AIRA, the intelligence running through every workflow, reads notes as well as fields. A search for &#8220;CFO candidates who were open to relocation last year&#8221; can surface people whose only signal was a line in a call note. The AIRA Job Change Alert Agent starts watching migrated contacts and<\/span><a href=\"https:\/\/recruiterflow.com\/job-change-alert\" target=\"_blank\" rel=\"noopener\"> <span style=\"font-weight: 400;\">flags when they move<\/span><\/a><span style=\"font-weight: 400;\">, turning an old database into a source of new conversations.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The results from firms that made the switch are specific:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Guy Last Recruitment<\/b><span style=\"font-weight: 400;\"> came off Bullhorn and saw a<\/span><a href=\"https:\/\/recruiterflow.com\/case-studies\/guy-last-recruitment-case-study\" target=\"_blank\" rel=\"noopener\"> <span style=\"font-weight: 400;\">142% increase in job orders<\/span><\/a><span style=\"font-weight: 400;\">, alongside 40% more submittals.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>MBR Partners<\/b><span style=\"font-weight: 400;\">, another Bullhorn switcher, turned a cleaner workflow into a<\/span><a href=\"https:\/\/recruiterflow.com\/blog\/recruiting-productivity-mbr-case-study\/\" target=\"_blank\" rel=\"noopener\"> <span style=\"font-weight: 400;\">75% increase in placements<\/span><\/a><span style=\"font-weight: 400;\">.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Mercury Hampton<\/b><span style=\"font-weight: 400;\">, an executive search firm, cut time-to-fill from<\/span><a href=\"https:\/\/recruiterflow.com\/case-studies\/how-mercury-hampton-turned-their-crm-into-a-revenue-engine\" target=\"_blank\" rel=\"noopener\"> <span style=\"font-weight: 400;\">106 days to 37<\/span><\/a><span style=\"font-weight: 400;\"> by putting its existing database to work.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">The migration experience itself shows up in reviews too. On G2, ease of use, especially during onboarding, is the most frequently praised theme, followed by customer support <\/span><i><span style=\"font-weight: 400;\">(Source:<\/span><\/i><a href=\"https:\/\/g2.com\/products\/recruiterflow\/reviews?page=2\"> <i><span style=\"font-weight: 400;\">G2<\/span><\/i><\/a><i><span style=\"font-weight: 400;\">)<\/span><\/i><span style=\"font-weight: 400;\">. Recruiterflow holds a 4.7\/5 rating from 332 reviews on<\/span><a href=\"https:\/\/www.capterra.com\/p\/165636\/Recruiterflow\/reviews\"> <span style=\"font-weight: 400;\">Capterra<\/span><\/a><span style=\"font-weight: 400;\">, and more than<\/span><a href=\"https:\/\/recruiterflow.com\/customers\" target=\"_blank\" rel=\"noopener\"> <span style=\"font-weight: 400;\">2,100 search and recruiting firms<\/span><\/a><span style=\"font-weight: 400;\"> run on it.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Frequently_asked_questions\"><\/span><b>Frequently asked questions<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><b>How long does an ATS migration take?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">A full ATS migration for a recruiting firm typically takes 6 to 8 weeks, including notes, call logs and communication history. Simpler migrations with mostly structured data can take about 2 weeks. Data volume, data quality and how quickly your team signs off matter more than headcount.<\/span><\/p>\n<h3><b>Can we keep working during the migration?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Yes, with the right setup. In Recruiterflow, core features are usable from day one, so your team can add candidates, run pipelines and send emails while historical data is still moving. A final run before go-live brings across any records created in the old system since the export.<\/span><\/p>\n<h3><b>What data gets lost when switching ATS?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Structured fields rarely get lost. The risk sits with unstructured history: notes, attachments, email threads and call logs, which some vendors scope separately. Ask for a sample migration that includes them before you sign.<\/span><\/p>\n<h3><b>How long should we run both systems in parallel?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Around two weeks is usually enough, with all new activity entered only in the new system. Longer parallel runs tend to split data across two places and slow adoption.<\/span><\/p>\n<h3><b>Who needs to be involved from our side?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">One named project owner who can make decisions, plus a few senior users to review migrated records in the sandbox. Partners and leadership mainly need to approve the final sign-off and back the cut-over date.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"See_your_own_timeline\"><\/span><b>See your own timeline<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The most accurate migration timeline is the one built on your own data. Bring a sample export to a demo, and we will map it against the week-by-week plan, notes and call logs included, so you know exactly what your migration looks like before you commit.<\/span><\/p>\n<p><a href=\"https:\/\/recruiterflow.com\/get-demo\" target=\"_blank\" rel=\"noopener\">Book a Recruiterflow demo<\/a>. The firms winning tomorrow start today.<\/p>\n<p><a href=\"https:\/\/recruiterflow.com\/get-demo\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" class=\"aligncenter size-full\" src=\"https:\/\/recruiterflow.com\/blog\/wp-content\/uploads\/2026\/03\/banner-get-demo.png\" alt=\"Book a Recruiterflow demo\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Every ATS migration quote comes with a number. Very few come with a definition of what that number covers. A full ATS migration for a recruiting or search firm typically takes 6 to 8 weeks, including notes, call logs and communication history. A simpler move, mostly structured records from a spreadsheet or basic system, can <a href=\"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/\" class=\"more-link\">&#8230;<span class=\"screen-reader-text\">  How Long Does an ATS Migration Take? A Week-by-Week Timeline<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":26695,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[105],"tags":[],"class_list":["post-26740","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-software-and-tools"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.7 (Yoast SEO v26.7) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>How Long Does ATS Migration Take? Week-by-Week Timeline<\/title>\n<meta name=\"description\" content=\"This post covers the ATS migration timeline week by week, including what happens, who owns each step, and what speeds up or delays the move.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How Long Does an ATS Migration Take? A Week-by-Week Timeline\" \/>\n<meta property=\"og:description\" content=\"This post covers the ATS migration timeline week by week, including what happens, who owns each step, and what speeds up or delays the move.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/\" \/>\n<meta property=\"og:site_name\" content=\"Recruiterflow Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/recruiterflow\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-27T09:32:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-11-27T09:37:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/recruiterflow.com\/blog\/wp-content\/uploads\/2026\/11\/Blog-banner-1200\u00d7630-export-at-2\u00d7@1x.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Abhishek Sharma\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@recruiterflow\" \/>\n<meta name=\"twitter:site\" content=\"@recruiterflow\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Abhishek Sharma\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/\"},\"author\":{\"name\":\"Abhishek Sharma\",\"@id\":\"https:\/\/recruiterflow.com\/blog\/#\/schema\/person\/6ab08d3340249b63c56479039c28aa3b\"},\"headline\":\"How Long Does an ATS Migration Take? A Week-by-Week Timeline\",\"datePublished\":\"2026-11-27T09:32:45+00:00\",\"dateModified\":\"2026-11-27T09:37:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/\"},\"wordCount\":1916,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/recruiterflow.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/recruiterflow.com\/blog\/wp-content\/uploads\/2026\/11\/Blog-banner-1200\u00d7630-export-at-2\u00d7@1x.png\",\"articleSection\":[\"Software and Tools\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/\",\"url\":\"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/\",\"name\":\"How Long Does ATS Migration Take? Week-by-Week Timeline\",\"isPartOf\":{\"@id\":\"https:\/\/recruiterflow.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/recruiterflow.com\/blog\/wp-content\/uploads\/2026\/11\/Blog-banner-1200\u00d7630-export-at-2\u00d7@1x.png\",\"datePublished\":\"2026-11-27T09:32:45+00:00\",\"dateModified\":\"2026-11-27T09:37:06+00:00\",\"description\":\"This post covers the ATS migration timeline week by week, including what happens, who owns each step, and what speeds up or delays the move.\",\"breadcrumb\":{\"@id\":\"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/#primaryimage\",\"url\":\"https:\/\/recruiterflow.com\/blog\/wp-content\/uploads\/2026\/11\/Blog-banner-1200\u00d7630-export-at-2\u00d7@1x.png\",\"contentUrl\":\"https:\/\/recruiterflow.com\/blog\/wp-content\/uploads\/2026\/11\/Blog-banner-1200\u00d7630-export-at-2\u00d7@1x.png\",\"width\":1200,\"height\":630,\"caption\":\"How long does an ATS migration take? A week-by-week timeline\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/recruiterflow.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How Long Does an ATS Migration Take? A Week-by-Week Timeline\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/recruiterflow.com\/blog\/#website\",\"url\":\"https:\/\/recruiterflow.com\/blog\/\",\"name\":\"Recruiterflow\",\"description\":\"Blog for Recruiting and Executive Search Firms\",\"publisher\":{\"@id\":\"https:\/\/recruiterflow.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/recruiterflow.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/recruiterflow.com\/blog\/#organization\",\"name\":\"Recruiterflow\",\"alternateName\":\"Recruiterflow\",\"url\":\"https:\/\/recruiterflow.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/recruiterflow.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/recruiterflow.com\/blog\/wp-content\/uploads\/2023\/05\/Group-6758.png\",\"contentUrl\":\"https:\/\/recruiterflow.com\/blog\/wp-content\/uploads\/2023\/05\/Group-6758.png\",\"width\":200,\"height\":200,\"caption\":\"Recruiterflow\"},\"image\":{\"@id\":\"https:\/\/recruiterflow.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/recruiterflow\",\"https:\/\/x.com\/recruiterflow\",\"https:\/\/www.linkedin.com\/company\/recruiterflow\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/recruiterflow.com\/blog\/#\/schema\/person\/6ab08d3340249b63c56479039c28aa3b\",\"name\":\"Abhishek Sharma\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/recruiterflow.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/f11e32a5d9766be25d9425bf847984a3abcb13b6138678a9f7f89cf506a3ca0c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/f11e32a5d9766be25d9425bf847984a3abcb13b6138678a9f7f89cf506a3ca0c?s=96&d=mm&r=g\",\"caption\":\"Abhishek Sharma\"},\"description\":\"Abhishek holds 7+ years of experience in helping companies rank for over 1,000 commercial keywords with a data-driven approach. As the SEO lead at Recruiterflow, he drives strategies that boost organic visibility and ensure competitive growth. Outside of work, Abhishek is a dedicated father of two, finding balance between his passion for SEO and family life.\",\"sameAs\":[\"https:\/\/recruiterflow.com\/blog\",\"https:\/\/www.linkedin.com\/in\/saas-seo-consultant\/\"],\"honorificPrefix\":\"Mr\",\"birthDate\":\"1996-02-02\",\"gender\":\"male\",\"knowsAbout\":[\"Search Engine Optimization\"],\"knowsLanguage\":[\"English\"],\"jobTitle\":\"SEO Specialist\",\"worksFor\":\"Manan Shah\",\"url\":\"https:\/\/recruiterflow.com\/blog\/author\/abhishek\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"How Long Does ATS Migration Take? Week-by-Week Timeline","description":"This post covers the ATS migration timeline week by week, including what happens, who owns each step, and what speeds up or delays the move.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/","og_locale":"en_US","og_type":"article","og_title":"How Long Does an ATS Migration Take? A Week-by-Week Timeline","og_description":"This post covers the ATS migration timeline week by week, including what happens, who owns each step, and what speeds up or delays the move.","og_url":"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/","og_site_name":"Recruiterflow Blog","article_publisher":"https:\/\/www.facebook.com\/recruiterflow","article_published_time":"2026-11-27T09:32:45+00:00","article_modified_time":"2026-11-27T09:37:06+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/recruiterflow.com\/blog\/wp-content\/uploads\/2026\/11\/Blog-banner-1200\u00d7630-export-at-2\u00d7@1x.png","type":"image\/png"}],"author":"Abhishek Sharma","twitter_card":"summary_large_image","twitter_creator":"@recruiterflow","twitter_site":"@recruiterflow","twitter_misc":{"Written by":"Abhishek Sharma","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/#article","isPartOf":{"@id":"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/"},"author":{"name":"Abhishek Sharma","@id":"https:\/\/recruiterflow.com\/blog\/#\/schema\/person\/6ab08d3340249b63c56479039c28aa3b"},"headline":"How Long Does an ATS Migration Take? A Week-by-Week Timeline","datePublished":"2026-11-27T09:32:45+00:00","dateModified":"2026-11-27T09:37:06+00:00","mainEntityOfPage":{"@id":"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/"},"wordCount":1916,"commentCount":0,"publisher":{"@id":"https:\/\/recruiterflow.com\/blog\/#organization"},"image":{"@id":"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/#primaryimage"},"thumbnailUrl":"https:\/\/recruiterflow.com\/blog\/wp-content\/uploads\/2026\/11\/Blog-banner-1200\u00d7630-export-at-2\u00d7@1x.png","articleSection":["Software and Tools"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/","url":"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/","name":"How Long Does ATS Migration Take? Week-by-Week Timeline","isPartOf":{"@id":"https:\/\/recruiterflow.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/#primaryimage"},"image":{"@id":"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/#primaryimage"},"thumbnailUrl":"https:\/\/recruiterflow.com\/blog\/wp-content\/uploads\/2026\/11\/Blog-banner-1200\u00d7630-export-at-2\u00d7@1x.png","datePublished":"2026-11-27T09:32:45+00:00","dateModified":"2026-11-27T09:37:06+00:00","description":"This post covers the ATS migration timeline week by week, including what happens, who owns each step, and what speeds up or delays the move.","breadcrumb":{"@id":"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/#primaryimage","url":"https:\/\/recruiterflow.com\/blog\/wp-content\/uploads\/2026\/11\/Blog-banner-1200\u00d7630-export-at-2\u00d7@1x.png","contentUrl":"https:\/\/recruiterflow.com\/blog\/wp-content\/uploads\/2026\/11\/Blog-banner-1200\u00d7630-export-at-2\u00d7@1x.png","width":1200,"height":630,"caption":"How long does an ATS migration take? A week-by-week timeline"},{"@type":"BreadcrumbList","@id":"https:\/\/recruiterflow.com\/blog\/ats-migration-timeline\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/recruiterflow.com\/blog\/"},{"@type":"ListItem","position":2,"name":"How Long Does an ATS Migration Take? A Week-by-Week Timeline"}]},{"@type":"WebSite","@id":"https:\/\/recruiterflow.com\/blog\/#website","url":"https:\/\/recruiterflow.com\/blog\/","name":"Recruiterflow","description":"Blog for Recruiting and Executive Search Firms","publisher":{"@id":"https:\/\/recruiterflow.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/recruiterflow.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/recruiterflow.com\/blog\/#organization","name":"Recruiterflow","alternateName":"Recruiterflow","url":"https:\/\/recruiterflow.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/recruiterflow.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/recruiterflow.com\/blog\/wp-content\/uploads\/2023\/05\/Group-6758.png","contentUrl":"https:\/\/recruiterflow.com\/blog\/wp-content\/uploads\/2023\/05\/Group-6758.png","width":200,"height":200,"caption":"Recruiterflow"},"image":{"@id":"https:\/\/recruiterflow.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/recruiterflow","https:\/\/x.com\/recruiterflow","https:\/\/www.linkedin.com\/company\/recruiterflow\/"]},{"@type":"Person","@id":"https:\/\/recruiterflow.com\/blog\/#\/schema\/person\/6ab08d3340249b63c56479039c28aa3b","name":"Abhishek Sharma","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/recruiterflow.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/f11e32a5d9766be25d9425bf847984a3abcb13b6138678a9f7f89cf506a3ca0c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f11e32a5d9766be25d9425bf847984a3abcb13b6138678a9f7f89cf506a3ca0c?s=96&d=mm&r=g","caption":"Abhishek Sharma"},"description":"Abhishek holds 7+ years of experience in helping companies rank for over 1,000 commercial keywords with a data-driven approach. As the SEO lead at Recruiterflow, he drives strategies that boost organic visibility and ensure competitive growth. Outside of work, Abhishek is a dedicated father of two, finding balance between his passion for SEO and family life.","sameAs":["https:\/\/recruiterflow.com\/blog","https:\/\/www.linkedin.com\/in\/saas-seo-consultant\/"],"honorificPrefix":"Mr","birthDate":"1996-02-02","gender":"male","knowsAbout":["Search Engine Optimization"],"knowsLanguage":["English"],"jobTitle":"SEO Specialist","worksFor":"Manan Shah","url":"https:\/\/recruiterflow.com\/blog\/author\/abhishek\/"}]}},"_links":{"self":[{"href":"https:\/\/recruiterflow.com\/blog\/wp-json\/wp\/v2\/posts\/26740","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/recruiterflow.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/recruiterflow.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/recruiterflow.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/recruiterflow.com\/blog\/wp-json\/wp\/v2\/comments?post=26740"}],"version-history":[{"count":1,"href":"https:\/\/recruiterflow.com\/blog\/wp-json\/wp\/v2\/posts\/26740\/revisions"}],"predecessor-version":[{"id":26741,"href":"https:\/\/recruiterflow.com\/blog\/wp-json\/wp\/v2\/posts\/26740\/revisions\/26741"}],"wp:attachment":[{"href":"https:\/\/recruiterflow.com\/blog\/wp-json\/wp\/v2\/media?parent=26740"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/recruiterflow.com\/blog\/wp-json\/wp\/v2\/categories?post=26740"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/recruiterflow.com\/blog\/wp-json\/wp\/v2\/tags?post=26740"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}